First Presbyterian Church Renovation

Matthew Miller, the Head Pastor, had a clear vision for the upgrades his church needed. Inspired by a photo of a church stage in Oregon designed for performances, he brought that idea to our Design-Build team. We took it from there, crafting a new stage that is now double the size of the original, which was constructed back in 1954. This upgraded stage features wide steps, a wheelchair accessibility lift, and modern tile flooring—exactly what contemporary churches require for a vibrant performance space. With these enhancements, the church can now host concerts, readings, and hold services in a lively, acoustically-rich environment.